construction for the 'tianjin west railway station' by hamburg-based gmp architekten has recently completed
in tianjin, china. positioned 130 kilometers southwest of beijing, this hub will become a new stop on the
high speed line between the capital city and shanghai in addition to providing connections to the regional
and underground networks. the structure will facilitate a commercial area to the north and an original city
center to the south, bridging and unifying the encompassing urban context.

terminal concourse
image © christian gahl
two points of entry evoke a large scale gate, framed with arched windows above the entrances. connecting
each end of the station, a central spine formed with an extensive 57 meter high and 400 meter long barrel
vault roof defines the main terminal concourse. supported with a steel diagrid, the glazed panels flood the
interior with abundant natural daylight while solar radiation is blocked with an additional structural tier
which is interwoven to generate a dynamic appearance. a series of arcades protect the tracks which meet
the building along the east and west elevation, perpendicularly to the main concourse. passengers descend
to the platforms below grade via a series of escalators.

daylight fills the concourse
image © christian gahl

view of concourse from mezzanine
image © christian gahl

barrel vault roof
image © christian gahl

escalators leading to platforms below grade
image © christian gahl

arcade protecting platforms
image © christian gahl

view while approaching on train
image © christian gahl

elevation
image © gmp

section
image © gmp

section
image © gmp

site plan
image © gmp

floor plan / level 0
image © gmp

floor plan / level -1
image © gmp
project info:
competition: 2007 – 1st prize
design: meinhard von gerkan and stephan schütz with stephan rewolle
project leader: jiang lin lin
design team, phase 1: iris belle, shi liang, du peng, chunsong dong
design team, phase 2: nicolas pomränke, jochen sültrup, clemens ahlgrimm, christian dorndorf, bernd gotthardt,
clemens kampermann, kian lian, sabine stage, cai wei
design team, phase 3: sebastian linnack, thomas schubert, zheng shan shan
detailed design team, phase 4 dong shu ying, sebastian linack, thomas schubert, zheng shan shan
structural engineers: schlaich bergermann und partner
chinese partner practice: tsdi
client: tianjin ministry of railway
gross floor area: 179,000 m²
number of platforms: 24
construction period: 2009–2011